Move-in checklist for ZA tenancies

An incoming inspection checklist for South African rental properties, built for landlords and agents to meet the joint inspection requirement of the Rental Housing Act and protect the deposit.

What to inspect

The Rental Housing Act 50 of 1999 requires you to inspect the property jointly with the tenant before they move in. Work through it together, photograph every defect, have both parties sign, and give the tenant a copy. Skip the joint inspection and you are deemed to have accepted the property was in good condition, which forfeits your right to claim against the deposit.

Entrance

Check the front door operates smoothly and locks securely. Note the condition of the doorbell and entry lighting.

  • Front door
  • Lock and hardware
  • Doorbell
  • Lighting

Hallway

Check walls, doors and floor coverings along the hallway. Note any marks, scuffs or trip hazards.

  • Walls
  • Doors
  • Lights and plug points
  • Floors and floor coverings

Lounge

Check walls, doors, windows and heating. Test that all lights and plug points work.

  • Walls
  • Doors
  • Lights and plug points
  • Floors and floor coverings
  • Windows
  • Blinds and curtains
  • Heating

Kitchen and dining

Test all appliances, taps and lights. Check cupboards open and close properly and note any damage to counters or surfaces.

  • Walls
  • Doors
  • Lights and plug points
  • Floors and floor coverings
  • Windows
  • Blinds and curtains
  • Built-in cupboards
  • Sink and counters
  • Stove and oven
  • Fridge
  • Extractor fan

Bathroom

Test taps, shower pressure and toilet flush. Check for leaks, mould or damage to fittings.

  • Walls
  • Doors
  • Lights and plug points
  • Floors and floor coverings
  • Windows
  • Blinds and curtains
  • Mirror and cabinet
  • Bath
  • Shower
  • Basin and vanity
  • Toilet
  • Extractor fan

Laundry

Test the washing machine and check the laundry sink for damage or leaks.

  • Walls
  • Doors
  • Lights and plug points
  • Floors and floor coverings
  • Windows
  • Blinds and curtains
  • Washing machine
  • Laundry sink

Bedroom

Check walls, doors, windows and floor coverings.

  • Walls
  • Doors
  • Lights and plug points
  • Floors and floor coverings
  • Windows
  • Blinds and curtains
  • Built-in cupboards

Stairs

Check the handrail is secure and treads are free of damage or hazards.

  • Handrail
  • Treads and risers
  • Lighting

General

Check refuse bins, locks and insulation. Confirm smoke alarms are present and working throughout the property.

  • Refuse bins
  • Locks
  • Insulation
  • Smoke alarms present and working

Garage

Check the garage door and remote operate correctly. Note the condition of the floor and any damage to walls.

  • Walls
  • Doors
  • Lights and plug points
  • Floor
  • Door and remote

Carport

Check the roof and supports are sound and free of damage.

  • Roof and supports
  • Floor
  • Lighting

Exterior

Check external walls and paintwork, gutters and downpipes. Note any signs of moisture or damage.

  • External walls and paintwork
  • Gutters and downpipes

Garden

Check lawns, gardens and fencing are in reasonable condition. Confirm the postbox is present and usable.

  • Lawns and gardens
  • Fencing
  • Washing line
  • Postbox

Stoep or veranda

Check the floor surface, roof and any built-in seating for damage.

  • Floor surface and tiling
  • Roof and supports
  • Lighting
  • Railings

Braai area

Check the braai, chimney and surrounding surfaces.

  • Braai and grid
  • Chimney and flue clear
  • Work surface
  • Lighting
  • Gas connection where fitted

Paving and driveway

Check the driveway surface, gate and any damage to paving.

  • Paving and driveway surface
  • Automated gate and motor
  • Gate remotes handed over
  • Drainage

Security

Test every security feature and hand over all remotes. Record the armed response provider and account details.

  • Burglar bars secure
  • Security gates and locks
  • Alarm system and panic buttons
  • Armed response provider and account details
  • Electric fence and energiser
  • Perimeter wall or palisade fencing
  • Intercom or gate motor
  • Remotes handed over and counted
  • Outdoor lighting and beams

Backup power and water

Record what is supplied and whether it works.

  • Inverter and batteries
  • Solar panels and controller
  • Generator and fuel
  • UPS units
  • Surge protection
  • Water storage tank and pump
  • Borehole and pump where present
  • Instructions handed to the tenant

Swimming pool

Check the pump, the safety barrier required by the local by-law, and the equipment supplied.

  • Pump and filter working
  • Pool safety net or fence
  • Pool surface and tiling
  • Cleaning equipment supplied
  • Water level and clarity

Parking and access

Record the parking bay and count every access item handed over.

  • Parking bay number recorded
  • Access tags and remotes handed over
  • Number of each access item recorded
  • Visitor access arrangements

Furniture and inventory

List furniture and inventory provided by the landlord.

Keys

Photograph all keys supplied and note the count, including spares, garage remotes and postbox keys.

  • Number of keys supplied
  • Spare keys
  • Garage remote
  • Postbox key

Deposit

The deposit must be held in an interest-bearing account. Record the amount and the account.

  • Deposit amount recorded
  • Deposit held in an interest-bearing account
  • Interest rate confirmed to the tenant

Geyser and hot water

Check the valves, drip tray and overflow carefully, and photograph the installation.

  • Geyser and mounting secure
  • Pressure control valve
  • Temperature and pressure safety valve
  • Drip tray and overflow pipe clear
  • Insulation blanket fitted
  • Element and thermostat working
  • Geyser timer where fitted
  • No leaks or water staining

Electrical compliance

A valid electrical Certificate of Compliance is required under the Electrical Installation Regulations 2009, made under the Occupational Health and Safety Act 85 of 1993. A gas CoC and an electric fence CoC are needed where those installations are present.

  • Valid electrical Certificate of Compliance on file
  • Distribution board and circuit labelling
  • Earth leakage tested and tripping
  • Plug points and light fittings undamaged
  • No exposed or temporary wiring
  • Gas Certificate of Compliance where a gas installation is present
  • Electric fence Certificate of Compliance where an electric fence is installed

Municipal accounts and meters

Record every meter number and reading, and confirm which accounts transfer to the tenant.

  • Prepaid electricity meter number and reading
  • Water meter number and reading
  • Municipal account transfer confirmed
  • Refuse and rates account status
  • Body corporate levies where applicable

Your paper template is ready

Did you know you can run this on myInspections?

  • Snap photos and videos as you go
  • Generate a report you can share with a secure link
  • E-sign the report and invite others to e-sign
  • Third-party backup of your inspection
Try in myInspections
The paperless way

Run your Move-in on your phone

Start from this template in the myInspections app, work through each area, and capture photos and video as you go.

Templates preloaded, ready to inspect
Photos, video and mark-ups, straight from your phone
Flag maintenance with a note and it lands in the report
Start your trial
Reports

Consistent, professional reports

Share a secure link that opens in any browser, or download a polished PDF.

Anyone can view your report from a shared link
Sign on any device, no account needed
Your logo on every report your team sends

Ditch the paper on your next inspection.

Finish the report before you get back to the car.